- Spread a ½-inch layer of compost including 50% soil on the loosened soil in the first
trench. - Thoroughly mix the compost placed on top of the lower first trench into the soil 12
inches deep. - Dig out the upper part of the second trench and move it forward into the first trench.
- Loosen the lower part of the second trench.
- Spread a ½-inch layer of compost including 50% soil on the loosened soil in the
second trench.
brent
(Brent)
#1