288 ELECTROSTATIC PRECIPITATION
movement over one quarter of the building length rather than
over one half, at least in the north–south direction.
Design Phase
To accomplish the above design changes, four major obsta-
cles had to be overcome:
1) The centerline support girders for each precipita-
tor unit had to be fixed, or at least stiffened, so that
they could come as close to being a zero expansion
line (N–S) as possible.
2) Expansion points had to be designed for the 36
Line girder connections.
3) Column Line 36 had to be braced in order to
stabilize the building after the connections were
cut free.
4) Provisions had to be made for the outward move-
ment of the peripheral columns around the building.
For the normal operating temperature of the units (670°F),
it was decided to assume the support steel temperature would
rise to an average of 500°F during operation, and provide for
the large movements involved. This temperature rise would
be applied to all steel directly below the plan dimensions of
each unit with the framing beyond these dimensions only
assumed to rise to 200° F. Under this assumed combination
of temperature rises, the maximum differential movement
expected was approximately 2½ in the north–south direc-
tion as well as in the easterly direction. The heavily braced
LL Column Line in the boiler house would act as the zero
movement line in the east–west direction.
The center support girders for the lower units were restrained
by shifting adjacent vertical diagonal bracing to fix the PP320,
PP390, M320, and MM390 columns at the + 42−8 elevation.
The G5 girders on the upper units were stiffened with horizon-
tal members and bracing as indicated in Figure 10.
The expansion joint design for the 36 Line connections
utilized ball bearing assemblies except for the G4 connections
ROCKER
BEARING PLATE
SUPPORT BRACKET
HANGER ROD
640"
G4 GIRDER
DETAIL " A"
DETAIL "B"
3 " CLEAR
3" CLEAR
SECTION "4–4"
SECTION "1–1"
FACE OF COLUMN
G4 GIRDER
BEARING PLATE
SUPPORTINGBRACKET FACE OF COLUMN
STOP
SOLE
ROCKER
ROCKER BEAM
(^44)
COLUMN
0036
SHELL PLATE
"HOT POCKET"
HOPPER
INSULATION
HOPPER PLATE
HOPPER STIFFENER
SUPPORT GIRDER
EL + 105'-6"
EL + 125'-2"
EL + 126'-2"
EL + 133'-2"
EL + 42'-4"
EL + 38'-11"
EL + 25'-2"
EL + 15'-0"
EL + 114'-6"
TRUSS
TRUSS
GRADE
ROOF
430 36
2 12 " EXPANSION
SECTION "3–3" SECTION "2–2"
3 " CLEAN
BALL BEARING
ASSEMBLY
BEARING
4 41 " HANGER ROD
9'-1^12 "
FIGURE 11
C005_005_r03.indd 288C005_005_r03.indd 288 11/18/2005 10:22:03 AM11/18/2005 10:22:03 AM