234 APPENDIX A
Addendum #1
- Detail 16 on sheet S8.1 is a cross section of Detail 1 on
sheet S8.1. - Detail 7 on sheet S8.1 is a cross section of Detail 16 on
sheet S8.1. - The vertical rebar in Detail 13 on sheet S8.1 should be
#5 in lieu of the #4 specified. - In Detail 13 on sheet S8.1, provide #5, L-shaped dowels
at 11 o.c. to connect foundation to the footing. - Figure A.1 is to be used to construct the grade beam
along the south wall of the building.
FIGURE A.1.Grade Beam Detail