K. IU 6: 6500 TPD, Integrated Unit at Rajasthan


S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)
Total - Clinkerization 44,436 5,541 125
Grinding Section
1 Fly Ash Silo 780 134 172
2 Cement Silo 2,097 467 223
3 Cement Mill Building & Bag House 4,260 529 124
4 Cement Mill Hopper 626 80 128
5 Packing Plant + Empty Bag Godown + Truck Loading 3,478 350 101
6 Fly Ash unloading system 679 67 99
7 MRSS 308 38 123
Total - Grinding 12,228 1,665 131
Common Facilities
1 CCR Building 1,070 171 160
2 Weigh Bridge 467 49 105
3 Other Misc. 4,690 552 118
Total - Common Facilities 6,227 772 124
Infrastructure
1 Plant Flooring 4,439 -
2 Plant Roads & Drains
3 WHRS +Pipe rack 2,582 -
Total - Infra 7,021 - -
Grand Total 69,912 7,978 114
1 Clinkerisation Section 44,436 5,541 125
2 Grinding Section 12,228 1,665 136
3 Common Facilities 6,227 772 124
4 Infrastructure 7,021 - -
Grand Total 69,912 7,978 114

S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)
Clinkerisation Section
1 Lime Stone Stock pile 1,330 - -