technical NOTES

(Project Pridr) #1
Comparison for 4/ 5/6 Stage Preheater (Estimation at 9500 TPD Capacity) 
PH Stage Reduction
Remarks
Data Unit 4 stage 5 Stage 6 Stage

Steel and
fabrication
weight of
cyclone


Lacs Rs -360 -180 0

AS calculated
90 Tonnes of 1
cyclone of each
string
Steel &
fabrication cost
considered Rs
100000/t

Dip tube cost Lacs Rs -196.8 -98.4 0


8.2 T dip tube
weight /Rs 600
kg cost /tube

Refractory



  • Double
    insulation
    weight


Lacs Rs -476 -238 0

Refractory
weight
considered 680
for 2 cyclone
and both strings
Refractory cost
considered
Rs 35000 /t
including laying

Down comer
duct Lacs Rs -25.6 -12.8^0


Steel weight
for 16 meter for
each stage

Kiln feed BE
cost Lacs Rs -48 -24^0


BE cost
considered
1.5 lacs/meter.
Approx. height
by 16 meter in
one stage
Total Capital
Cost In Cement
Plant Savings


 -1840 -920 