Description FLSmidth KHD Humboldt
Wedag
Thyssen Krupp
Polysiyus
Type of Technology
/Equipment
Hot Disc PyroRotor Prepol - SC
(Step combustor)
Procedure
adopted
AF is fed into Hot disc
is a slow speed rotary
disc installed near the
calciner bottom area.
Raw meal is fed, just
near to AF feeding
point & Tertiary air is
drawn from cooler
A small rotary tube is
install in precalciner
and part of Raw
meal feed, AF and
tertiary air is passed
through this tube
finally goes to Cal-
ciner
A small inclined
combustion grates
Is installed to feed
AF with air cannons
at the bottom. AF is
fed in this by feeding
screw and part of
Raw meal is fed, just
above AF feeding
point & Tertiary air is
drawn from cooler
Types of AF can
be used
- Waste oil, Animal
Meal - Bio mass
- Plastic/paper
sludge - RDF/Fluff
- Tire chips
- Whole tyre
- wood waste
- Waste oil, Animal
Meal - Bio mass
- Plastic/ paper
sludge - RDF/Fluff
- Tire chips
- Whole tyre
- Waste oil, Animal
Meal - Bio mass
- Plastic/ paper
sludge - RDF/Fluff
- Tire chips
- Whole tyre
- Waste oil, Animal
- Waste oil, Animal
Size of AF used
(mm) < 300 < 300 , 3D < 300
% TSR on PC coal
requirement 80-90 >98 80-90
Process covered
Heating up, drying,
degasification,
ignition
Heating up, drying,
degasification,
ignition
Heating up, drying,
degasification,
ignition
Residence time of
AF ( Minutes )
Residence time 3 –
45 min., depending
on Speed and
therefore on fuel
capacity.
Residence time 5 –
15 min., depending
on Speed and
therefore on fuel
capacity.
Residence time ~ 15
min., depending on
fuel feed rate.
Speed required 0.33 RPM Max 0.3-3 RPM
Pneumatic transport.
No moving parts