technical NOTES

(Project Pridr) #1
Description FLSmidth KHD Humboldt
Wedag

Thyssen Krupp
Polysiyus

Type of Technology
/Equipment


Hot Disc PyroRotor Prepol - SC
(Step combustor)

Procedure
adopted


AF is fed into Hot disc
is a slow speed rotary
disc installed near the
calciner bottom area.
Raw meal is fed, just
near to AF feeding
point & Tertiary air is
drawn from cooler

A small rotary tube is
install in precalciner
and part of Raw
meal feed, AF and
tertiary air is passed
through this tube
finally goes to Cal-
ciner

A small inclined
combustion grates
Is installed to feed
AF with air cannons
at the bottom. AF is
fed in this by feeding
screw and part of
Raw meal is fed, just
above AF feeding
point & Tertiary air is
drawn from cooler

Types of AF can
be used



  • Waste oil, Animal
    Meal

  • Bio mass

  • Plastic/paper
    sludge

  • RDF/Fluff

  • Tire chips

  • Whole tyre

  • wood waste

    • Waste oil, Animal
      Meal

    • Bio mass

    • Plastic/ paper
      sludge

    • RDF/Fluff

    • Tire chips

    • Whole tyre

      • Waste oil, Animal
        Meal

      • Bio mass

      • Plastic/ paper
        sludge

      • RDF/Fluff

      • Tire chips

      • Whole tyre






Size of AF used
(mm) < 300 < 300 , 3D < 300
% TSR on PC coal
requirement 80-90 >98 80-90


Process covered


Heating up, drying,
degasification,
ignition

Heating up, drying,
degasification,
ignition

Heating up, drying,
degasification,
ignition

Residence time of
AF ( Minutes )


Residence time 3 –
45 min., depending
on Speed and
therefore on fuel
capacity.

Residence time 5 –
15 min., depending
on Speed and
therefore on fuel
capacity.

Residence time ~ 15
min., depending on
fuel feed rate.

Speed required 0.33 RPM Max 0.3-3 RPM
Pneumatic transport.
No moving parts