WOODWORKING
Name:____ Date:_____
Project:____Current Grade:
Grading Scale: 1= Poor 2= Needs work 3= Good 4= Well done 5= Excellent
Grading Notes: Plus sign (+) = progressing saƟsfactory, work complete, demonstrates competence.
Zero (0) = no progress evident, needs improvement, demonstrates lack of understanding.
Minus sign (‐) = conƟnued failure to show progress, does not follow instrucƟon, incompetence.
Project Preparation
G. Pictorial Drawing (week 6)..............................................................................................
- Pictorial: _____
H. Drafting Plans (week 7)....................................................................................................
- Views: _____
(Completed top, front, and right‐side views, secƟons) - Drawing Quality: _____
(Penmanship, neatness, line type, line quality, orderliness, layout) - Scale: _____
(Drawn to scale, dimensions, notaƟons) - Title Block: _____
(logo/company name, student name, class, date, project Ɵtle, scale, drawing number)
I. Purchasing (week 8)..........................................................................................................
- Material List: _____
(Shopping list complete, lumber purchase size, hardware needed, finish materials) - Cuƫng Schedule: _____
(Item leƩer, name, finish cut size, wood type, plywood cut layout)
J. Project Construction (week 9)........................................................................................
- Project knowledge: _____
(Understands overall cut layout, desired joinery methods, assembly process)
K. Tool Usage (week 10)........................................................................................................
- Cuƫng has begun: _____
- Tool Usage: _____
(Skillful, efficient, safe, and thoughƞul use of tools)
L. Overall work ethic............................................................................................................
- Progress: _____
(CorrecƟons/updates made to porƞolio. Progress Check 1 correcƟons made. Showing
sufficient progress on work. On task to meet deadlines) - Work Ethic: _____
(Daily work ethic evaluaƟon: CooperaƟon, diligence, and behavior)
Progress Check Total:
Grade Report:
□ Missing Prompts
□ Low Test Scores
□ Undeveloped Project PreparaƟon
□ Project Plans do not meet draŌing standards
□ Project construcƟon lacks progress
□ Overall Work Ethic needs improvement
30
Pictorial
DraŌing
ConstrucƟon
Tool Usage
Work Ethic
Purchasing
Appendix: Project Check 2