Highway Engineering

(Nandana) #1

Example 2.4 Contd


Destination Forecasted
total
Origin 1 2 3 4 origins
10300 750 225 3825
2 150 0 450 75 1675
3 300 300 0 450 2100
4 150 120 600 0 1375
Forecasted 700 1000 5500 1800
total
destinations

Table 2.6Matrix of
existing flows and
forecasted outbound
and inbound trip totals

Destination Existing Forecasted Origin
total total growth
Origin Z1 Z2 Z3 Z4 origins origins factor
Z1 0 300 750 225 1275 3825 3.00
Z2 150 0 450 75 675 1675 2.48
Z3 300 300 0 450 1050 2100 2.00
Z4 150 120 600 0 870 1375 1.58
Existing total 600 720 1800 750
destinations
Forecasted 700 1000 5500 1800
total destinations
Destination 1.17 1.39 3.06 2.4
growth factor

Table 2.7Calculation of origin and destination growth factors


Destination
Origin Z1 Z2 Z3 Z4
Z1 0 900 2250 675
Z2 372 0 1117 186
Z3 600 600 0 900
Z4 237 190 948 0
Amended 1209 1690 4315 1761
destination flows
Forecasted 700 1000 5500 1800
destination flows
Destination 0.58 0.59 1.27 1.02
growth factor

Table 2.8Production of
first amended matrix
and revision of
destination growth
factors

Contd

Destination Amended Forecasted
outbound outbound Growth
Origin Z1 Z2 Z3 Z4 flows flows factor
Z1 0 533 2868 690 4091 3825 0.94
Z2 215 0 1423 190 1828 1675 0.92
Z3 347 355 0 920 1622 2100 1.29
Z4 137 112 1209 0 1458 1375 0.94

Table 2.9Production of second revised matrix and revision of origin growth factors