operation would not appear to be the result of loss of diversity but rather the high inrush currents. Since
inrush occurs during all energization and not just as a result of cold load pickup, it can be concluded
that cold load pickup is not a major factor in the application of FCIs.
Load CurrentFault
CurrentFault
Initiated(Contacts
Closed)2 s 2 s 2 sTimeReclosing Intervals
(Contacts Open)"Fast" Operations
(Contacts Closed)"Time Delay" Operations
(Contacts Closed)Recloser
Lockout
(Contacts
Open)Line RecloserDead TimeI sc Cycles^30 5 s 15 s 30 sCurrent vs. Time
Feeder Breaker ReclosingFIGURE 23.4 Reclosing sequences.
051015202530Transformers Laterals Feeders
LocationP.U. of Full LoadFIGURE 23.5 Magnitudes of inrush current.