Drawing Number
1.15
Double Door - Level 4 - Mag Lock
Date:
UI Hospitals & Clinics
Iowa City Iowa 52242
Scale
4/27/2011
CV
Job Number
Serial Number Drawn By
Project
Documents
Revisions
Drawing Type
Card Access Details
None
Safety & Security Card Access Standards
1in conduit sleeve into JB from
unsecured side of door
Ceiling
Structure
48 in AFF
J
Box
To Card Access Panel
¾ in EMT Raceway with pull string
½ in Flex Raceway with pull string
RDR
PIR / ALM
DSM
To Video System
DSM
PTE
LCK
KEY
Located on secured
side of door
Located on public
side of door
Device Rough In Requirements
Device Description Opening
JB 4sq Junction Box on secure side of door. ¾ in sleeve to unsecured side of door. Cables will be routed from the cable pathway in the corridor thru this sleeve into the JB. S SecuredSide
RDR ¾ conduit raceway from un-secured ceiling into the wall down to the RDR location. Provide 4sq box in wall with 1G mud ring vertical. U UnSecuredSide
CAM location or exterior lcoation, provide a 4sq box at location with a ¾ in raceway to cable Accessible location near cable tray, no rough-in is required. In a inaccessible ceiling
tray. Coordinate the inaccessible locations with the SSC
C Ceiling
S U U
F F F F
S
S
U
KEY ¾ conduit raceway from the RDR to the KS.Provide 4sq box in wall with 1G mud ring vertical. U UnSecuredSide
PTE ¾ conduit raceway from the ceiling to the PTE location. Provide 4sq box in wall with 1G mud ring vertical. S SecuredSide
LCK ½ flex raceway from J-Box into the wall down to the door lock location. Coordinate the location on frame with the GC. F Frame
DSM
S U
Door can be Single or Double Egress.
Coordinate with SSC and GC on Device locations.
IP
CAM
DSM Use PIR / ALM raceway to PIR / ALM Box. Provide a pull wire from this box location to each DSM switch. F Frame
PIR
ALM
Secured
S Side
½ flex raceway from secured side of room into the wall down to the PIR/ALM location.
Provide 4sq box in wall with 1G mud ring horizontal.
LCK
Note:
1 If door is single egress, the leaf exiting the secured space does not require
a LCK or PTE if no pull hardware is provided.
Note 1
Note 1
November 1, 2016