GRAPHICS SREEMANIKANDAN S., SYAM KRISHNAN
ROVER (PRAGYAN)
PAYLOAD
The rover is a six-wheeled AI-powered vehicle which will perform detailed
study of topography, seismography, mineral identification and distribution,
surface chemical composition, thermo-physical characteristics of top soil
and composition of the lunar atmosphere
Mass 27kg
Power 50W
Expected life: One lunar
day (14 earth days)
Solar panel
Alpha Particle X-ray
Spectrometer
THE JOURNEY
Mission director Ritu Karidhal
Project director M. Vanitha
Date of launch July 15, 2019
Date of moon landing September 6/7
Cost of mission
0 603 crore
for spacecraft
0 375 crore
for launcher
Injected into a temporary
earth parking orbit after
three stages of detachment
I
i
o i
L it
(100
from the moon
surface)
I on of
lander into lunar
pre-landing orbit
Orbiter
propulsion
is ignited and
injected into
the lunar transfer
trajectory (LTT)
Earth parking orbit
(170 x 40,400 km
from the Earth surface)
Injection
into lunar
orbit
Lunar orbit
0 x 100 km
m the moonon
surface)ce
Injectioo
landerlanderii
Vikram is expected
to land on
September 6, 2019.
Subsequently, the
rover will roll out
Chandrayaan-2 will
be launched from
Satish Dhawan Space
Centre at Sriharikota
A series of manoeuvres will
raise its orbit and put
Chandrayaan-2 on the LTT
Imaging of the
landing site
region
Navigation
camera
Laser Induced Breakdown
Spectroscope
Orbiter
separation
1
2
3
4
5
6
7
8
9
Orbit around earth
16 days
Transfer to lunar orbit
5 days
Orbit around moon
27 days
JULY 21, 2019 • THE WEEK 25