IHC highwheelers from 1907 to 1916.
Rick Quirin, at left, with assistance from Tracy, eases the cylinder
jugs over the pistons and rings.
In place, the jug is bolted tight. The job is repeated for the other
cylinder. Then the unit is set atop a sturdy bench in order to
provide clearance for the flywheel. Better yet, use a small, sturdy