technical NOTES

(Project Pridr) #1

Note: Approximate investment cost will be INR 1.6 crore approx., may vary based
on addition and deletion of edge devices /sensors
It is strongly recommended, for new plant with 100% digitization which will help
to optimize process, manpower and reliability of plant.



  • Anomaly predictions before breakdowns and results

  • Savings on Energy

  • Increase in machine performance and production.

  • Provides right data for answering any questions, accurate conclusions from
    the archived system analyzed data

  • It accelerates the decision making process in business

  • Increased accuracy and speed.

  • Transparency – everybody gets access to the same real-time data.

  • Traceability – every step of the process can be tracked easily.

  • No manual document work – meaning no waste of time.

  • OEE improved by 20-50% – if you know where exactly and why you are
    wasting resources allows you to take all the necessary actions to improve
    your overall performance.

  • Optimized planning – producing only what’s needed when it’s needed. You
    can easily create the perfect production plan. No more overproduction.

  • Cut down lead time, deliver on time

  • Monitor performance in real-time and spend less time reporting

  • Make your staff mobile – operators and workers from the shop floor can
    work more efficiently if they have the right data at hand. We have 40% aver
    age time savings reported by businesses using Production.

  • Digitization of the manufacturing process has a positive impact on the over
    all business performance.

  • Digital transformation brings better working environment for your staff and
    makes everyday operations much faster and easier.


S. N. System Description

Hardware and
Software /SMART
sensor cost in INR

Annual
Subscription
Charges in INR
1 Wireless Vibration Sensors for 100 No 43,00,000 Nil

2

Online Oil monitoring (Tan Delta
Number and Temperature) Sensor for 4
No Equipment

1715000 Nil

3

AI based System Industry 4.0 Software
and Hardware with Server with mobile
app and interfaces etc. (for one plant )

1,00,00,000 6,00,000

(^) Total 1,60,50,000 6,00,000

Free download pdf