technical NOTES

(Project Pridr) #1

B. CU 1: 3000 TPD, Clinkerisation Unit at Nepal


S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)
Clinkerisation Section
1 Lime Stone Stock pile 1,800 - -
2 Coal Stockpile
3,970

--


3 Corrective/Additive stockpile - -
4 Blending Silo 1,702 - -
5 Clinker Silo 5,620 - -
6 Preheater Tower + compressor 3,060 - -
7 Kiln Piers & TA Duct 640 - -
8 Cooler + Cooler ESP + DPC 1,700 - -
9 Raw Material Hopper
700

--


10 Raw Mill Building 2,900 -
11 Coal Mill + Coal Mill Hopper 1,030 - -
12 Corrective Crusher 740 - -
13 Belt Conveyors + Transfer Towers 880 - -
14 Switch yard and load centres 1,415 - -
Total - Clinkerization 26,157 - -
1 Clinkerisation Section 26,157 - -
2 Grinding Section - - -
3 Common Facilities - - -
4 Infrastructure - - -
Grand Total 26,157 - -