technical NOTES

(Project Pridr) #1

S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)


4 Blending Silo 1,359 299 220
5 Clinker Silo 3,661 487 133
6 Preheater Tower + compressor 6,602 1,067 162
7 Kiln Piers & TA Duct 1,976 123 62
8 Cooler + Cooler ESP + DPC 2,545 294 116
9 Raw Mill Building 5,487 568 104
10 Raw Mil Bag House 1,530 214 140
11 Coal Mill + Coal Mill Hopper 1,972 256 130
12 LS Crusher 5,943 646 109
13 Belt Conveyors + Transfer Towers 888 83 93
14 Over Head Cable Gallery & Cable Trenches 155 10 66
15 Switch yard and load centres 1,334 142 106
16 Clinker Wagon Loading system 2,273 175 77
Total - Clinkerization 38,949 4,544 117
Grinding Section
1 Fly Ash Silo 953 208 218
2 Cement Silo 862 261 303
3 Cement Mill Building & Bag House 2,734 354 130
4 Cement Mill Hopper 178 18 101
5 Packing Plant + Empty Bag Godown + Truck Loading 616 64 104
Total - Grinding 5,343 905 117
Common Facilities
1 H.E.M. Workshop 24 3 104
2 Water Treatment Plant 247 22 89
3 Other Misc. 521 54 103
Total - Common Facilities 792 78 99
Grand Total 45,085 5,528 123
1 Clinkerisation Section 38,949 4,544 117
2 Grinding Section 5,343 905 169
3 Common Facilities 792 78 99
4 Infrastructure - - -
Grand Total 45,085 5,528 123