technical NOTES

(Project Pridr) #1

F. IU 1: 4500 TPD, Integrated Unit at Karnataka


S. N. Buildings (M3)RCC TMT(MT) R/f Factor(Kg/m3)
6 Canteen Building 267 25 94
7 Truck Parking 2,000 140 70
8 Fire Fighting 156 12 80
9 Site office 19 3 144
10 Toilet Blocks 60 5 83
11 High Mast 37 4 107
Total - Common Facilities 6,504 609 94
Infrastructure
1 Boundary Wall 1,158 150 130
2 Plant Flooring 4,815 105 22
3 Plant Roads & Drains 13,575 493 36
4 WHRS +Pipe rack 5,469 720 132
Total - Infra 25,017 1,468 59
Grand Total 99,627 12,331 124
1 Clinkerisation Section 68,106 10,254 151
2 Grinding Section - - -
3 Common Facilities 6,504 609 94
4 Infrastructure 25,017 1,468 59
Grand Total 99,627 12,331 124

S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)
Clinkerisation Section
1 Lime Stone Stock pile 3,433 523 152
2 Coal Stockpile 3,502 537 153
3 Corrective/Additive stockpile 2,823 445 158
4 Blending Silo 2,408 517 215
5 Clinker Silo 5,457 1,086 199
6 Preheater Tower + compressor 5,768 1,485 257
7 Kiln Piers & TA Duct 2,150 258 120
8 Cooler + Cooler ESP + DPC 3,184 549 172
9 Raw Material Hopper 880 181 206
10 Raw Mill Building 3,976 749 188