technical NOTES

(Project Pridr) #1
S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)
1 CCR Building 1,037 170 164
2 Weigh Bridge 238 13 55
3 Water Treatment Plant 633 61 96
4 Raw Water reservoir 81 -
5 Compressor House 228 23 101
Total - Common Facilities 2,217 267 120
Infrastructure
1 Plant Flooring 4,439
2 Coal Shed for CPP 1,158
3 WHRS +Pipe rack 1,001
Total - Infra 6,598 - -
Grand Total 65,449 7,597 116
1 Clinkerisation Section 42,474 5,144 121
2 Grinding Section 14,160 2,186 154
3 Common Facilities 2,217 267 120
4 Infrastructure 6,598 - -
Grand Total 65,449 7,597 116

I. IU 4: 4750/8200 TPD, Integrated Unit at Chhattisgarh


S. N. Buildings (M3)RCC TMT(MT) R/f Factor(Kg/m3)
Clinkerisation Section
1 Lime Stone Stock pile 6,203 - -
2 Coal Stockpile 6,355 - -
3 Corrective/Additive stockpile 2,155 - -
4 Blending Silo 5,813 - -
5 Clinker Silo 18,516 - -
6 Preheater Tower + compressor 3,372 - -
7 Kiln Piers & TA Duct 3,488 - -
8 Cooler + Cooler ESP + DPC 4,745 - -
9 Raw Material Hopper 1,400 - -
10 Raw Mill Building 4,509 - -
11 Raw Mil Bag House 2,281 - -
12 Truck Tippler 282 - -