S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)
12 Truck Tippler 910 - -
13 Coal Mill + Coal Mill Hopper 2,773 - -
14 LS Crusher 5,542 - -
15 CCBC 4,482 - -
16 Oil Storage Tanks 136 - -
17 Belt Conveyors + Transfer Towers 2,047 - -
18 Over Head Cable Gallery & Cable Trenches 1,097 - -
19 Raw Material Substation 199 - -
20 LS Crusher Substation 409 - -
21 Switchyard 253 - -
22 Main Substation 178 - -
23 Alternate Fuel Storage Shed 2,196 - -
Total - Clinkerization 63,469 - -
Grinding Section
1 Fly Ash Silo 2,435 - -
2 Cement Silo 7,791 - -
3 Cement Mill Building & Bag House 6,191 - -
4 Cement Mill Hopper 1,195 - -
5 Packing Plant + Empty Bag Godown + Truck Loading 4,523 - -
6 HGG and coal dozing 533 - -
7 Truck Tippler 921 - -
8 Belt Conveyor (Post clinker) 216 - -
9 Over Head Cable Gallery & Cable Trenches - Grinding section 577 - -
10 Cement Mill Substation 1,187 - -
Total - Grinding 25,569 - -
Common Facilities
1 CCR Building 2,368 - -
2 Admin Bldg. 502 - -
3 H.E.M. Workshop 428 - -
4 Weigh Bridge 109 - -
5 Water Treatment Plant 1,828 - -