S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)
6 Raw Water reservoir 1,118 - -
7 General Store 975 - -
8 Gate House 416 - -
9 Canteen Building 159 - -
10 Transport office 121 - -
11 Fire Fighting 85 - -
12 Toilet Blocks 20 - -
13 STP 48 - -
14 Tea Booth / Rest shelter 28 - -
15 Other Misc. 239 - -
Total - Common Facilities 8,444 - -
Infrastructure
1 Plant Flooring 2,984 - -
2 WHRS +Pipe rack 3,896 - -
Total - Infra 6,880 - -
Grand Total 1,04,362 - -
1 Clinkerisation Section 63,469 - -
2 Grinding Section 25,569 - -
3 Common Facilities 8,444 - -
4 Infrastructure 6,880 - -
Grand Total 1,04,362 - -

M. IU 8: 9000 TPD, Integrated Unit at Chhattisgarh


S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3)
Clinkerisation Section
1 Lime Stone Stock pile 4,314 372 86
2 Coal Stockpile 4,324 317 73
3 Blending Silo 5,000 530 106
4 Clinker Silo 5,225 847 162
5 Preheater Tower + compressor 10,510 1,915 182
6 Kiln Piers & TA Duct 2,000 122 61
7 Cooler + Cooler ESP + DPC 3,842 409 106
8 Raw Material Hopper 518 69 134
Free download pdf