technical NOTES

(Project Pridr) #1

Comparison for 4/ 5/6 Stage Preheater (Estimation at 9500 TPD Capacity) 
PH Stage Reduction
Remarks
Data Unit 4 stage 5 Stage 6 Stage
Grid power
Cost
Rs/ kwh 7.1 7.1 7.1 


Cost of Power
generation by
WHRS


Rs/ kwh 0.3 0.3 0.3 

Clinker
Production
TPD 9500 9500 9500 Potential capacity


PH Exit sp. gas
volume


Nm3/ kg
clinker

1.45 1.4 1.33


Sp. Fuel
Consumption
kcal/kg clinker 725 700 680


4 Stage 725
5 Stage 700
6 Stage 680

PH exit gas
volume
Nm3/ hr 573958 554167 526458


PH exit gas
temperature
Deg c 340 290 265


Boiler outlet
temperature
Deg c 150 150 150


PH Gas specific
heat


Kcal/ Nm3/
deg c

0.350 0.348 0.348


Heat available
for WHR from
PH


Mkcal/ hr 38.18 27.03 21.05

Heat utilised in
WHR
kcal/kg clinker 96.45 68.30 53.17


Power
generation
potential (
3800 kcal/
kwh) from PH
Gross


MW 10.05 7.11 5.54