operation would not appear to be the result of loss of diversity but rather the high inrush currents. Since
inrush occurs during all energization and not just as a result of cold load pickup, it can be concluded
that cold load pickup is not a major factor in the application of FCIs.
Load Current
Fault
Current
Fault
Initiated
(Contacts
Closed)
2 s 2 s 2 s
Time
Reclosing Intervals
(Contacts Open)
"Fast" Operations
(Contacts Closed)
"Time Delay" Operations
(Contacts Closed)
Recloser
Lockout
(Contacts
Open)
Line Recloser
Dead Time
I sc Cycles^30 5 s 15 s 30 s
Current vs. Time
Feeder Breaker Reclosing
FIGURE 23.4 Reclosing sequences.
0
5
10
15
20
25
30
Transformers Laterals Feeders
Location
P.U. of Full Load
FIGURE 23.5 Magnitudes of inrush current.