SMRP BoK Review Workbook
APPENDICES
A. Answer Keys
1. Pre-Assessment
# Answer
- B
- C
- D
- A systems engineering process for establishing and maintaining
consistency of a product's performance, functional, and physical
attributes with its requirements, design, and operational
information throughout its life
- B
- C
- D
- C
- C
- C
- D
- B
- A
- A
- B
2. Post-Assessment (Jeopardy Style)
# Answer
- An organization’s dream
- RASI Diagram
- An organization’s purpose
- Specific, Measurable, Attainable, Relevant, and Time-Bound
# Answer
- Anyone in the organization’s internal and external environment that
are affected by the organization’s decision and actions
- Overall Equipment Effectiveness
- Availability x Performance rate x Quality Rate
- Total Productive Maintenance
- Define, Measure, Analyze, Improve, Control
- Any of these: 5 - Why, Sequence of Events, Event and Causal Factor
(ECF) Analysis, Fault Tree Analysis, Logic Tree Analysis, Cause and
Effect, FMEA, FMECA
- 6
- Random and age-related
- Failure Reporting and Corrective Action System
- A quantitative state of what the asset or system is required to
perform
- The effect by which a failure is observed on the failed item
- An international standard that specifies requirements for an asset
management system within the context of the organization
- 80
- Forming, Storming, Norming, Performing
- 8
- A common set of values, beliefs, attitudes, perceptions, and
accepted behaviors shared by individuals within an organization.
- Weeks
- 2 weeks
- Job Plan Library
- Subjective tasks
- Asset Criticality & Work Priority