Fig. 3.3.3c. The water storage tank cast from
reinforced concrete around the pipe, a delicate
work, was constructed only in 1931. Photo PSA.
Fig. 3.3.3b. The skeleton of the building was
cast in situ floor by floor. Photo PSA.
Fig. 3.3.3a. The image shows the floor curving up towards the window in the patients’ rooms under
construction. The load-bearing pillars in the corridor wall. Photo PSA.