Estimating in Building Construction
222 CHAPTER NINETEEN FIGURE 19.2.Coordination Issues. Item Coordination Requirements Underground utilities Location, size, exca ...
Heating, Ventilating, and Air-Conditioning 223 Heating (warm air): boiler fuel oil tanks gauges accessories thermostats wiring c ...
224 20–1 Profit Profit is not included in a chapter with other topics because it is the last thing considered and must be taken ...
foolishness—it only invites disaster. If a project entails substantial risk and it is questionable that a profit can be made, co ...
226 21–1 Overview For the most of this book, we have focused on the detailed estimate, identifying and pricing each of the compo ...
year. Using this information, prepare a preliminary estimate for the new warehouse. When collecting data for use in project co ...
228 CHAPTER TWENTY-ONE Div. Item Old Project Adjustment New Project 3 Under-Slab Gravel 8,989 0.923 8,297 3 Footing and Foundati ...
Other Estimating Methods 229 by the perimeter adjustment, and the resultant is added or deducted from the base cost per square f ...
230 CHAPTER TWENTY-ONE FIGURE 21.3.Warehouse Square Foot Costs. From Means Square Foot Cost Data 2007. Copyright RS Means, Kings ...
Other Estimating Methods 231 cost is then used to bid the assembly by multiplying the quantity of the assembly by the unit cost ...
232 CHAPTER TWENTY-ONE EXAMPLE 21-7 ASSEMBLY ESTIMATING USING RS MEANS Determine the costs for 50 100 warehouse excluding sit ...
233 DRAWINGS AND OUTLINE SPECIFICATIONS FOR SMALL COMMERCIAL BUILDING APPENDIX A T he drawings that accompany Appendix A are inc ...
234 APPENDIX A Addendum #1 Detail 16 on sheet S8.1 is a cross section of Detail 1 on sheet S8.1. Detail 7 on sheet S8.1 is a cr ...
235 DRAWINGS AND OUTLINE SPECIFICATIONS FOR RESIDENTIAL BUILDING PROJECT APPENDIXB T he drawings that accompany Appendix B are i ...
236 T he drawings that accompany Appendix C are included in the drawing packet that accompanies this textbook. These drawings ar ...
All vinyl tile shall be 1/8 inch thick, sheet vinyl. Bases shall be 1/8 inch thick, 2^1 ⁄ 2 inches high, color to be selected by ...
238 Addenda Statements or drawings that modify the basic contract documents after the latter have been issued to the bidders, bu ...
for each day the project remains uncompleted after the time stipulated. Brace Rods Rods used in roofs and walls to transfer wind ...
enhance appearance; the metalwork that prevents leakage over windows, doors, around chimneys, and at other roof details. Footing ...
Progress Payments Payments made during progress of the work, on account, for work completed and/or suitably stored. Progress Sch ...
«