Comparison for 4/ 5/6 Stage Preheater (Estimation at 9500 TPD Capacity)
PH Stage Reduction
Remarks
Data Unit 4 stage 5 Stage 6 Stage
Differential PH
Fan Sp. Power
consumption
KW / of T
clinker -0.110 -0.008 0.000
Differential
Bucket elevator
Sp. Power
consumption
KW / of T
clinker
-0.195 -0.100 0.000
Total Saving
on Power
(including
generation)
KW / of T
clinker
41.4 34.7 31.3
Saving
for power
generation
(Net ) (+)
Rs lacs / year 8825 7389 6682
Cost on
additional
Sp. Heat
consumption
(-)
Lacs Rs/ year 1411 627 0
Total Opex Lacs Rs/ year 7415 6762 6682
Differential
Opex
Lacs Rs/ year 733 80 0
Capex
Differential PH
civil concrete
cost
Lacs Rs -733 -367 0
Considering
11000 M3
concrete for 6
stage PH and
correspondingly
per stage factor
considered @
Rs.20000 /m3
cost