Pile Design and Construction Practice, Fifth edition
bridge strain gauged cantilever springs with a maximum capacity of 20 MN/m^2. Two hundred and forty pressuremeter tests using th ...
Ground investigations, contracts and testing 507 Thefalling-head testconsists of filling the borehole with water and measuring t ...
11.1.5 Offshore investigations Offshore investigations for deep-water structures and oil production platforms are highly special ...
Ground investigations, contracts and testing 509 which are separate from, but operate alongside, the works contract, are now fre ...
510 Ground investigations, contracts and pile testing have supervisory responsibilities (only co-ordination authority) under a J ...
Ground investigations, contracts and testing 511 loading tests, both on preliminary and working piles. While the Contractor is r ...
512 Ground investigations, contracts and pile testing construction and the Engineer/Designer should state the form in which they ...
Ground investigations, contracts and testing 513 standard under the various work classifications. BS8004 can be quoted for worki ...
514 Ground investigations, contracts and pile testing Piling records.The Engineer and the Contractor should agree to the form in ...
Table 11.2Daily pile record for driven pile ...
516 Ground investigations, contracts and pile testing While it is essential for the toe level and final set of every pile to be ...
Ground investigations, contracts and testing 517 Hollow precast concrete piles can be checked for alignment in a similar way to ...
Table 11.3Record for bored pile ...
Ground investigations, contracts and testing 519 in two parts according to BSEN 1536 Annex B for each bored pile. Records for CF ...
520 Ground investigations, contracts and pile testing to the comprehensive set of tables which detail the information and freque ...
Ground investigations, contracts and testing 521 of load testing since the failure load on the pile is not known with any certai ...
522 Ground investigations, contracts and pile testing With regard to loading procedures, EC7 Clause 7.5.2.1 only refers in a not ...
Ground investigations, contracts and testing 523 Where piles are installed through fill or soft clay these materials give positi ...
BSEN 1536 advises that the supports or anchorages of a reaction system for pile loading tests should observe minimum clearances ...
Ground investigations, contracts and testing 525 The settlement of the pile head under load can be measured optically by means o ...
«
20
21
22
23
24
25