PMBOK® Guide, page 674 , SectionX4.3

Key concepts for Project Schedule Management include:

o Projectschedulingprovidesadetailedplanthatrepresentshowandwhentheprojectwill
delivertheproducts,services,andresultsdefinedintheprojectscope;
o Theprojectscheduleisusedasatoolforcommunication,managingstakeholderexpectations,
andabasisforperformancereporting;and
o Whenpossible,thedetailedprojectscheduleshouldremainflexiblethroughouttheproject
to adjust for knowledge gained, increased understanding of the risk, and value-added
activities.

235.Answer:D.

PMBOK® Guide, page 674 , SectionX4.4

Key concepts for Project Cost Management include the following:

o ProjectCostManagementisprimarilyconcernedwiththecostoftheresourcesneededto
completeprojectactivities,butitshouldalsoconsidertheprojectactivities,butitshouldalso
consider the effect or project decisions on the subsequent recurring cost of using,
maintaining,andsupportingprojectdeliverables.
o Differentstakeholderswill measureproject costsindifferentways andat different times.
Stakeholderrequirementsformanagingcostsshouldbeconsideredexplicitly.
o Predictingandanalyzingtheprospectivefinancialperformanceoftheproject’sproductmay
beperformedoutsidetheproject,oritmaybepartofProjectCostManagement.

236.Answer:A.

PMBOK® Guide, page 675 , SectionX4.5

Key concepts for Project Quality Managementinclude:

o ProjectqualityManagementaddressesthemanagementoftheprojectandthedeliverablesofthe
project.Itappliestoallprojects,regardlessofthenatureoftheirdeliverables.Qualitymeasuresand
techniquesarespecifictothetypeofdeliverablesbeingproducedbytheproject.
o Qualityandgradearedifferentconcepts.
o Qualityis“thedegreetowhichasetofinherentcharacteristicsfulfillsrequirements”(ISO 9000 ).
o Gradeisacategoryassignedtodeliverableshavingthesamefunctionalusebutdifferenttechnical
characteristics.Theprojectmanagerandteamareresponsibleformanagingtrade-offsassociated
withdeliveringtherequiredlevelsofbothqualityandgrade.
o Preventionispreferredoverinspection.Itisbettertodesignqualityintodeliverables,ratherthanto
findqualityissuesduringinspection.Thecostofpreventingmistakesisgenerallymuchlessthanthe
costofcorrectingmistakeswhentheyarefoundbyinspectionorduringusage.



  1. Projectmanagersmayneedtobefamiliarwithsampling,includingattribute sampling(the
    resulteitherconformsordoesnotconform)andvariablesampling(theresultisratedona
    continuousscalethatmeasuresthedegreeofconformity).