technical NOTES
Objective To arrive at most appropriate and economical location and configuration of Preheater stack. Chimney A chimney is a str ...
RCC Chimney Note: Operating cost shall be validated with present condition Steel Chimney: - Guided with RCC framed structur ...
Guided Steel Chimney with RCC Framed Structure MS stack (05 M Diameter) of 110 M height guided with 4 nos. RCC column 10m C/C an ...
Note: Operating cost shall be validated with present condition Conclusion The decision of choosing an option from various types ...
Factors influencing choice of stack location and type: Plant layout and space availability Preheater height and Preheater boile ...
...
RABH BUILDING-CIVIL COST COMPARISON IN USING AIRSLIDE v/s REDLLER CONVEYOR ...
...
7.1 Objective: To analyze the cost of building Reverse Air Bag House in case of using air slide conveyor vs chain conveyor for t ...
7.4 Building Cost Analysis: A Typical building cost analysis is shown in below Table: Reddler Conveyor S. N. Item Rate Unit RABH ...
Note: Operating cost shall be validated with present condition 7.5 Conclusion The overall cost is tabulated in Table -1, which ...
...
RAW MEAL SILO COMPARISON BETWEEN BIN INSIDE ANDOUTSIDE ...
...
The intermediate bin of raw meal feeding to kiln are meant for weighing and uni form feeding of raw meal to Preheater I stage cy ...
Below table-1 shows the typical cost comparison between two layouts. S. N. Item Unit Rate Case 1-Bin Inside Silo Case 2-Bin Outs ...
S. N. Item Unit Rate Case 1-Bin Inside Silo Case 2-Bin Outside Silo (20m D x 52m H) (18m D x 45.9m H) Qty. (in Lacs)Amount Qty. ...
Table -2 Note: Operating cost shall be validated with present condition 8.3 Conclusion Based on the above data and comparison i ...
RCC RETAINING WALL SYSTEM - (COMPARISON OF COUNTERFORT & CANTILEVER RETAINING WALLS) ...
...
«