paimio sanatorium
basement of the B building, the bathing facilities for male and female patients were combined and the work spaces previously pla ...
MASTER DRAWINGS, APRIL 1930 Fig. 3.1.3j. Master drawing of the B wing plans, April 1930. The top image shows the basement floor ...
Some of the drawings were marked with a special ‘standard’ stamp. Most of such drawings were dated between August 1929 and Septe ...
Fig. 3.1.3k. Master drawing of the site plan, April 1930. The building was approached from southwest along a road. The yard betw ...
Fig. 3.1.3m. Master drawing of two plans of the C wing, and plans of the D wing, the district heating plant, in the middle, Apri ...
Fig. 3.1.3n. Master drawing of the north façade of A wing, April 1930. The north-facing elevation of the sundeck wing with its c ...
Fig. 3.1.3p. Master drawing of the façades and section of the district power station, and the B wing south façade, April 1930. D ...
Fig. 3.1.3q. Master drawing of the C wing long façades facing southeast and northwest, April 1930. Drawing No. 50-108a. The draw ...
3.2 The Financial Circumstances Surrounding the Building Project 3.2.1 PROJECT GREW, THE BUDGET WAS EXCEEDED AND FUNDING TANGLED ...
Chapter 3 | The Building of Paimio Sanatorium for that year.^620 The Building Board took out loans from both private lending ins ...
case of every single sanatorium had been exceeded by two to four million marks, including those projects that had been contracte ...
SUMMARY OF BUDGET AND STATE AID YEAR MONTH BUDGET [FIM] STATE’S EXPECTED SHARE, MAY 1930 [FIM] STATE’S ACTUAL SHARE [FIM] PAYMEN ...
ACTUAL BUILDING WORK Excavation, preliminary work 302,600 Foundations 554,545 Reinforced concrete frame 2,799,775 Bricklaying 2, ...
3.2.2 THE PIT OF DEPRESSION WAS REACHED IN 1932 IN FINLAND The magnitude of the Great Depression of the 1930s as well as its rep ...
declined. The depression resulted in wide-spread unemployment and tensions in the workplace grew. Right-wing radicalism reached ...
Chapter 3 | The Building of Paimio Sanatorium and as late as in 1933, it provided a list of hospitals undergoing refurbishment p ...
3.3 The Reinforced Concrete Frame: A Great Architectural Challenge 3.3.1 AALTO COLLABORATED WITH LOCAL DESIGNERS AND BUILDERS Th ...
Fig. 3.3.1a. The wall of the sundeck was cast against a layer of bricks placed in the formwork. The wall was built using the sli ...
The series of structural drawings for the Southwest Finland Agricultural Coop- erative Building, 104 drawings in total, was encl ...
Chapter 3 | The Building of Paimio Sanatorium partnership in a company supplying building materials.^663 It appears that Aalto w ...
«