technical NOTES
Property PEB buildings Conventional Steel Buildings Building Accessories Designed to fit the system with standardized and inter ...
Waterproof structure: The K-House adopts waterproof design so it does not need any separate waterproof treatment. Environmental ...
G+1 Storey Only 5.5 Costing Part of Each Module: - Summary Worker Housing for New Upcoming Projects S. N. Option Description L ...
5.6 Layout Options: - c. Ground Floor: - (Option 2&4) ...
d. Ground+1: - (Option 1&3) 5.7 Conclusion Based on above information, working and floor layout establishment we are recomme ...
...
COMPARISON OF PREHEATER STACK OPTIONS ...
...
Objective To arrive at most appropriate and economical location and configuration of Preheater stack. Chimney A chimney is a str ...
RCC Chimney Note: Operating cost shall be validated with present condition Steel Chimney: - Guided with RCC framed structur ...
Guided Steel Chimney with RCC Framed Structure MS stack (05 M Diameter) of 110 M height guided with 4 nos. RCC column 10m C/C an ...
Note: Operating cost shall be validated with present condition Conclusion The decision of choosing an option from various types ...
Factors influencing choice of stack location and type: Plant layout and space availability Preheater height and Preheater boile ...
...
RABH BUILDING-CIVIL COST COMPARISON IN USING AIRSLIDE v/s REDLLER CONVEYOR ...
...
7.1 Objective: To analyze the cost of building Reverse Air Bag House in case of using air slide conveyor vs chain conveyor for t ...
7.4 Building Cost Analysis: A Typical building cost analysis is shown in below Table: Reddler Conveyor S. N. Item Rate Unit RABH ...
Note: Operating cost shall be validated with present condition 7.5 Conclusion The overall cost is tabulated in Table -1, which ...
...
«
11
12
13