K. IU 6: 6500 TPD, Integrated Unit at Rajasthan S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3) Total - Clinkerization 4 ...
S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3) 2 Coal Stockpile 2,912 - - 3 Corrective/Additive stockpile 1,437 - - 4 B ...
S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3) 1 CCR Building 1,800 - - 2 Workshop 5,094 -- 3 H.E.M. Workshop - - 4 Wei ...
S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3) 12 Truck Tippler 910 - - 13 Coal Mill + Coal Mill Hopper 2,773 - - 14 LS ...
S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3) 6 Raw Water reservoir 1,118 - - 7 General Store 975 - - 8 Gate House 416 ...
S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3) 9 Raw Mill Building 4,818 446 93 10 Raw Mil Bag House 4,422 536 121 11 C ...
S. N. Buildings (M3)RCC R/f Steel(MT) R/f Factor(Kg/m3) 2 Grinding Section 19,610 2,541 130 3 Common Fasciitis 4,886 456 93 4 In ...
S. N. Plant Config. Plant Cap. (TPD) Railway Siding Infra RCC Factor / Ton of plant capacity Estimated Qty. for RCC (in M3) TMT ...
1.4 Costing Analysis of Various Projects Description Unit Project 1 Project 2 Project 3 Project 4 Project 5 Project 6 Location M ...
Description Unit Project 1 Project 2 Project 3 Project 4 Project 5 Project 6 Location Madhya Pradesh Odisha Chhattisgarh Odisha ...
SELECTION OF CAPACITY OF RAW MEAL SILO, CEMENT SILO, FLY ASH SILO ...
...
The manufacturing of the cement begins with the extraction and the preparation of raw material from raw material quarrying to fe ...
As an example, the kiln feed rate for the 4500 TPD clinker is 4500 TPD x clinkerisation factor 1.54 /24 hours = 288.75 t/hour. R ...
avoid jamming as far as possible low inclined chutes are required to be provided between conveyors and valley angles of hoppers, ...
Item UOM (In Rs.)R a t e Qty. Amount in (Lakhs) Qty. Amount in (Lakhs) Increase in price Steel Structure MT 90000 70 63 70 63 TO ...
Note: Operating cost shall be validated with present condition. Item UOM (In Rs.)Rate Qty. Amount in (Lakhs) Qty. in (Lakhs)Am ...
Selection of Cement Silo configuration (all costs are in lacs) S. N. Description 3 x 5000 2 x 7500 No of Silo Cost / Silo Total ...
Note: Operating cost shall be validated with present condition. 2.4 Conclusion 2.4.1 Blending Silo: With pre mill feed homogen ...
Based on the above facts and figures, it is advantageous to go for the silo storage capacity to 1 day with lower capital investm ...
«