Energy Project Financing : Resources and Strategies for Success
308 Energy Project Financing: Resources and Strategies for Success to verify it. A preliminary energy audit used for establishin ...
Appendix B 309 or as long as the time required to recover the investment cost of the ECM program. Establishment of the set of c ...
310 Energy Project Financing: Resources and Strategies for Success Specification of quality assurance procedures. Quantificatio ...
Appendix B 311 ECM reduces both equipment load and operating hours. Ex- ample: Resetting of temperature on hot water radiation ...
312 Energy Project Financing: Resources and Strategies for Success where assumptions can reasonably replace actual measurement. ...
Appendix B 313 pre-retrofit and post-retrofit periods. Only partial measurement is used under Option A, with some parameter(s) b ...
314 Energy Project Financing: Resources and Strategies for Success 3.4.1.1 Option A: Isolation Metering Measurement equipment mu ...
Appendix B 315 3.4.1.3 Installation Verification Since stipulation is allowed under this Option, great care is needed to review ...
316 Energy Project Financing: Resources and Strategies for Success vals can be short and occasional. Lighting fixtures provide a ...
Appendix B 317 The significance of the error introduced by possible variations between the stipulated and true values of parame ...
318 Energy Project Financing: Resources and Strategies for Success continuous or periodic. Annual costs should be expected to be ...
Appendix B 319 3.4.2 Option B: Retrofit Isolation The savings determination techniques of Option B are identical to those of Opt ...
320 Energy Project Financing: Resources and Strategies for Success sibly difficult non-routine Baseline Adjustments for future c ...
Appendix B 321 Accounting for changes (other than those caused by the ECMs) is the major challenge associated with Option C—part ...
322 Energy Project Financing: Resources and Strategies for Success so that the special demand recording equipment can be synchro ...
Appendix B 323 restaurant sales. To the extent that independent variables have a cyclical nature to them, the significance of th ...
324 Energy Project Financing: Resources and Strategies for Success least to the daily level to control the number of independent ...
Appendix B 325 data come from utility bills or other special whole building meters. If such special whole building sub-meters we ...
326 Energy Project Financing: Resources and Strategies for Success Option D may be used to assess the performance of all ECMs in ...
Appendix B 327 ment performance. The adjustments term in equation (1) is computed by running the simulation model under appropri ...
«