Telecommunications Design 9 TELECOMMUNICATIONS DESIGN Space Design: Telecommunications Room (TR) Telecommunications Rooms are ...
Telecommunications Design 10 The desire is that all walls hosting EZ-Path fire rated sleeves shall host the entire bank of slee ...
Telecommunications Design 11 b. Non-UPS Rack(s) i. Provide one (1) dedicated 120VAC quad receptacle and one (1) dedicated 208VAC ...
Telecommunications Design 12 The racks shall be a standard 7’ tall, 2-post with a floor mounted design. Provide with two-sided ...
Telecommunications Design 13 e. Exposed structural steel Fig. T1-1 K. Security Provide access control at each TR. Architect sha ...
Telecommunications Design 14 O. Acceptable Technology Hosted Inside the Telecommunications Room System Description Location Powe ...
Telecommunications Design 15 System Design: Horizontal Pathway System and Rough-in Requirements Horizontal pathways are used f ...
Telecommunications Design 16 C. Continuous Pathway: Conduit Conduit pathway sizing shall be based on 40% conduit fill. This sha ...
Telecommunications Design 17 System Design: Backbone Distribution System A backbone distribution system is the part of the pre ...
Telecommunications Design 18 The majority of HVAC work typically requires mechanical systems to have ducted returns. Therefore, ...
Telecommunications Design 19 o. Room environmental controls is adequate and operating to maintain proper temperature and humidit ...
Nurse Call Design 20 NURSE CALL DESIGN Design Requirements Overview This system (product, software and installation) shall be ...
Appendix A 21 APPENDIX A Approved Manufacturers and Products The following list of manufacturers and products are approved for ...
Appendix A 22 Ortronics Single Gang Plastic TracJack Faceplate 4 ports OR- 40300546 fog white Ortronics Double Gang Plastic Trac ...
Appendix A 23 Illustrations: Example Telecommunications Room (TR) See below for a sample buildout of an acceptable telecommuni ...
Appendix A 24 Sample Elevations Fig. T2-2 November 1, 2016 ...
Appendix A 25 November 1, 2016 ...
Appendix A 26 Keyed Notes Fig. T2-3 November 1, 2016 ...
Appendix A 27 Typical Rack Diagram Detail – Fig T2-4 November 1, 2016 ...
Appendix A 28 Illustrations: Typical Details The following details are typically found on all new construction and renovation ...
«
4