348 Energy Project Financing: Resources and Strategies for Success RMSE—Root mean square error (see Appendix B) Simulation Model ...
Appendix B 349 7 Baker, D. and Hurley, W. 1984. “On-Site Calibration of Flow Metering Systems Installed in Buildings,” NBS Build ...
350 Energy Project Financing: Resources and Strategies for Success ducers for use in the Texas LoanSTAR Program,” Proceedings of ...
Appendix B 351 27 Goldberg, M.L. 1996a. “The Value of Improved Measurements: Facing the Monsters That Won’t Annihilate Each Othe ...
352 Energy Project Financing: Resources and Strategies for Success 36 Huang, P. 1991. “Humidity Measurements and Calibration Sta ...
Appendix B 353 46 Kissock, K., Wu, X., Sparks, R., Claridge, D., Mahoney, J. and Haberl, J. 1994. “EModel Version, 1.4d,” Energy ...
354 Energy Project Financing: Resources and Strategies for Success 58 Reddy, T. and Claridge, D. 2000. “Uncertainty of “Measured ...
Appendix B 355 68 Wiesman, S. (ed.) 1989. Measuring Humidity in Test Chambers, General Eastern Corporation, 50 Hunt Street, Wate ...
356 Energy Project Financing: Resources and Strategies for Success 11 IESNA Publications, New York, New York. TEL: 212-248-5000, ...
Appendix B 357 The boundary of this ECM was drawn to include the ceiling mounted lighting circuits fed by the 277 volt supply, ...
358 Energy Project Financing: Resources and Strategies for Success Due to a change in occupancy patterns planned to take effect ...
Appendix B 359 — only half of the anticipated growth from 1,450 hrs to 2,000 hrs may happen, and — the 9% load fraction may be s ...
360 Energy Project Financing: Resources and Strategies for Success ——————————————————————————————— Baseyear Energy Use ————————— ...
Appendix B 361 The post-retrofit demand is 16.0 kW for each of 10 months and 8.0 kW for each of July and August, bringing the to ...
362 Energy Project Financing: Resources and Strategies for Success ———————————————————————————————— Baseyear – Post-Retrofit + A ...
Appendix B 363 in boiler efficiency No other equipment in the building uses gas. M&VPlan An M&V Plan was developed showi ...
364 Energy Project Financing: Resources and Strategies for Success has no error. The average efficiency readings for the three w ...
Appendix B 365 Post-Retrofit Energy Use After installation and commissioning of the ECM, three separate weekly test periods were ...
366 Energy Project Financing: Resources and Strategies for Success tor training and occupant awareness campaigns. The objectives ...
Appendix B 367 — the volume of make-up water supplied to the pool each month, as recorded by a separate uncalibrated sub-meter; ...
«