Dalmia DSP Success Story
12 PROjECT PRIDE up to the core of the material which reduces thermal loading in the kiln. Bigger size pre-calciner with retenti ...
TECHNICAL PREPARATION 13 Clinker Cooler For clinker cooler sizing and design, the specific requirement given to all suppliers we ...
14 PROjECT PRIDE overloading due to the bigger size of the clinker ball and also has lower maintenance due to improved wear comp ...
TECHNICAL PREPARATION 15 volume of O 2 maintaining the same flame momentum. However, suppliers were working on the same and have ...
16 PROjECT PRIDE the PG values are subject to change accordingly, so that any benefit which is not attributable to technology sh ...
TECHNICAL PREPARATION 17 Capacity requirement with respect to operating grindability: Capacity requirement given initially was ...
18 PROjECT PRIDE low there shouldn’t be any water spray requirement on table. Mill internal design/system design: It was discus ...
TECHNICAL PREPARATION 19 Maximum grinding pressure to be designed: Having higher margins on grinding pressure enables mill to h ...
20 PROjECT PRIDE productivity by 10% or so. Thereby we analysed this parameter and asked all suppliers to offer their mill with ...
TECHNICAL PREPARATION 21 One size bigger static & dynamic classifier than offered: Similar benefits as listed for VRM case. ...
22 PROjECT PRIDE Coal Grinding Technology We have provided following inputs to suppliers for designing the coal grinding system: ...
TECHNICAL PREPARATION 23 water spray on table but confirmed that mill would run at 150 ̊C even with some water spray on table M ...
24 PROjECT PRIDE is used for grinding and hence increases the grinding efficiency • Maximum grinding pressure to be designed: ...
TECHNICAL PREPARATION 25 Since the guarantee was on petcoke grinding we have asked suppliers to design all system auxiliaries fo ...
26 PROjECT PRIDE cost in case of higher footprint area of RABH is nullified. Thereby after analysing the overall operation cost ...
TECHNICAL PREPARATION 27 Brief of Plant Concept • After detailed discussions, we have gone with the concept of design and kiln ...
28 PROjECT PRIDE Unique features of this project: First time in the world: Latest JETFLEX burner (biggest in size) for kiln fir ...
TECHNICAL PREPARATION 29 Longest kiln of 81 metre for 5-metre diameter Turbo blowers used for coal conveying and primary air Ro ...
30 PROjECT PRIDE Digital light processing video wall installed at CCR for better plant operation NI-CD batteries for UPS and ba ...
TECHNICAL PREPARATION 31 Intelligent MCC with 12-inch LED screen Thermal camera for live view and temperature monitoring for ki ...
«