Dalmia DSP Success Story
26 PROjECT PRIDE cost in case of higher footprint area of RABH is nullified. Thereby after analysing the overall operation cost ...
TECHNICAL PREPARATION 27 Brief of Plant Concept • After detailed discussions, we have gone with the concept of design and kiln ...
28 PROjECT PRIDE Unique features of this project: First time in the world: Latest JETFLEX burner (biggest in size) for kiln fir ...
TECHNICAL PREPARATION 29 Longest kiln of 81 metre for 5-metre diameter Turbo blowers used for coal conveying and primary air Ro ...
30 PROjECT PRIDE Digital light processing video wall installed at CCR for better plant operation NI-CD batteries for UPS and ba ...
TECHNICAL PREPARATION 31 Intelligent MCC with 12-inch LED screen Thermal camera for live view and temperature monitoring for ki ...
32 PROjECT PRIDE Based on the above concepts we are going to have various advantages in terms of fuel saving, power saving, equi ...
TECHNICAL PREPARATION 33 S. No. Action taken (Equipment) Benefits Locations 2 Robo lab • Automatic sampling at various product s ...
34 PROjECT PRIDE S. No. Action taken (Equipment) Benefits Locations 5 Provision of covered storage For air pollution control Al ...
TECHNICAL PREPARATION 35 S. No. Action taken (Equipment) Benefits Locations 3 Provision of vibration sensors To take proactive ...
36 PROjECT PRIDE S. No. Action taken (Equipment) Benefits Locations 12 Provision of high temperature CCTV To monitor live burni ...
TECHNICAL PREPARATION 37 S. No. Action taken (Equipment) Benefits Locations E Cost saving initiatives 1 Provision of extra insul ...
38 PROjECT PRIDE S. No. Action taken (Equipment) Benefits Locations 10 Provision for using PROFIBUS communication Reduction in ...
Contract Awards Once the concept of the project was finalized at our team level, we had initiated the preparation of project bud ...
40 PROjECT PRIDE by the corporate affairs team. The proposed area for Project Pride at Rajgangpur was covered with dense bushes ...
CONTRACT AwARDs 41 proposed along the NGT corridor with a total track length of about 3.5 km enabling full rake clinker loading ...
42 PROjECT PRIDE were 400 hp capacity which were engaged in existing plant logistic requirements. As per the requirement of the ...
CONTRACT AwARDs 43 Puja for area clearing in May 2018 and tree transplantation work At the project concept stage, Dalmia DSP uni ...
44 PROjECT PRIDE nearly one lakh CuM (cubic metre). The infrastructure buildings, roads, drains, CCR, administrative building, c ...
CONTRACT AwARDs 45 buildings. Non-plant buildings including infrastructure and material handling structure works contract were a ...
«