Dalmia DSP Success Story
32 PROjECT PRIDE Based on the above concepts we are going to have various advantages in terms of fuel saving, power saving, equi ...
TECHNICAL PREPARATION 33 S. No. Action taken (Equipment) Benefits Locations 2 Robo lab • Automatic sampling at various product s ...
34 PROjECT PRIDE S. No. Action taken (Equipment) Benefits Locations 5 Provision of covered storage For air pollution control Al ...
TECHNICAL PREPARATION 35 S. No. Action taken (Equipment) Benefits Locations 3 Provision of vibration sensors To take proactive ...
36 PROjECT PRIDE S. No. Action taken (Equipment) Benefits Locations 12 Provision of high temperature CCTV To monitor live burni ...
TECHNICAL PREPARATION 37 S. No. Action taken (Equipment) Benefits Locations E Cost saving initiatives 1 Provision of extra insul ...
38 PROjECT PRIDE S. No. Action taken (Equipment) Benefits Locations 10 Provision for using PROFIBUS communication Reduction in ...
Contract Awards Once the concept of the project was finalized at our team level, we had initiated the preparation of project bud ...
40 PROjECT PRIDE by the corporate affairs team. The proposed area for Project Pride at Rajgangpur was covered with dense bushes ...
CONTRACT AwARDs 41 proposed along the NGT corridor with a total track length of about 3.5 km enabling full rake clinker loading ...
42 PROjECT PRIDE were 400 hp capacity which were engaged in existing plant logistic requirements. As per the requirement of the ...
CONTRACT AwARDs 43 Puja for area clearing in May 2018 and tree transplantation work At the project concept stage, Dalmia DSP uni ...
44 PROjECT PRIDE nearly one lakh CuM (cubic metre). The infrastructure buildings, roads, drains, CCR, administrative building, c ...
CONTRACT AwARDs 45 buildings. Non-plant buildings including infrastructure and material handling structure works contract were a ...
46 PROjECT PRIDE over package mode of ordering. After detailed discussion and analysis, looking to the benefits of EP mode in te ...
CONTRACT AwARDs 47 With a vision to install the best plant, the final specifications of major equipment awarded on M/s FLSmidth ...
48 PROjECT PRIDE Section Operating Remarks Biggest JETFLEX burner 134 MW (latest technology low PA burner) Latest design of burn ...
Execution Process Establishment Before embarking on our journey, we would like to highlight the contributions by each stakeholde ...
50 PROjECT PRIDE wireless-based IP CCTV surveillance system was deployed and integrated with the Dalmia enterprise network allow ...
ExECUTION PROCEss EsTABLIsHmENT 51 and finally added the items being dispatched. Once the supplier added driver details in the a ...
«